Practice mode / Calendar 36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work? A Option A: 12 B Option B: 18 C Option C: 22 D Option D: 24 E Option E: None of these Correct answer D. 24 Show answer Report a problem How we write and check questions
Question 01 / Calendar An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth? A Option A: 178 B Option B: 195 C Option C: 204 D Option D: 488 Correct answer B. 195 Show answer Open question
Question 02 / Calendar In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal? A Option A: 20 B Option B: 30 C Option C: 40 D Option D: 50 Correct answer B. 30 Show answer Open question
Question 03 / Calendar A flagstaff 17.5 m high casts a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be: A Option A: 10 m B Option B: 12.5 m C Option C: 17.5 m D Option D: 21.25 m Correct answer B. 12.5 m Show answer Open question
Question 04 / Calendar If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days? A Option A: 1 B Option B: 72 C Option C: 7 D Option D: 49 Correct answer C. 7 Show answer Open question
Discussion