Practice mode Bangladesh Current Affairs

What is the length of the Jamuna Railway Bridge formally opened in March 2025, the longest railway bridge in Bangladesh?

Correct answer C. 4.8 km

Explanation

The 4.8 km Jamuna Railway Bridge, financed largely by a JICA loan, was formally inaugurated on 18 March 2025 as Bangladesh's longest railway bridge, with dual-gauge double track.

Report a problem

Answer checked How we write and check questions

Tip: press A, B, C or D to answer, and N for the next question.

Advertisement

Have a question about this answer?

Your email address will not be published. Required fields are marked *

Links and website addresses are not allowed in comments.