Practice mode / Time and Work If As 1 days work = 1/20 then time required to finish the job (in days) A Option A: 20 B Option B: 10 C Option C: 25 D Option D: 30 Correct answer A. 20 Show answer Report a problem How we write and check questions
Question 01 / Time and Work If A can do a piece of work in 10 days then part of work done by him in one day. A Option A: 2?5 B Option B: 3?8 C Option C: 1?10 D Option D: 3?7 Correct answer C. 1?10 Show answer Open question
Question 02 / Time and Work An inlet pipe can fill a tank in 10 hrs and an outlet pipe empties the same full tank in 20 hrs. The time required to fill the tank when both pipes are opened. A Option A: 10 B Option B: 20 C Option C: 30 D Option D: 25 Correct answer B. 20 Show answer Open question
Question 03 / Time and Work If an outlet pipe empties a full tank in 20 hrs then part of tank emptied in one hour. A Option A: 3?20 B Option B: 2?5 C Option C: 1?10 D Option D: 1?20 Correct answer D. 1?20 Show answer Open question
Question 04 / Time and Work If an inlet pipe fills a tank in 10 hrs and another inlet pipe fills the same tank in 5 hrs then time required to fill the tank when both pipes are opened. A Option A: 10?3 B Option B: 3?10 C Option C: 1?3 D Option D: 3 Correct answer A. 10?3 Show answer Open question
Discussion